Cipher Posts Profit On Paper Warrant Gain
Cipher Digital reported $31.6 million of third-quarter net income on November 2. A $127.2 million non-cash gain on its warrant liability did the lifting while revenue fell 63%.
$31.6 million of profit. $127.2 million of it is paper.
Cipher Digital reported third-quarter net income of $31.6 million on November 2, a profit built almost entirely on a $127.2 million paper gain.
The operating business shrank while the new one barely started. Total revenue fell to $26.7 million from $71.7 million a year earlier, split between $20.8 million from bitcoin mining and $5.9 million of HPC leasing revenue, the first rent the company has collected, from its Black Pearl site in Texas. The operating loss widened to $71.9 million from $37.6 million, and adjusted EBITDA swung to a loss of $10.0 million from a gain of $40.8 million.
The gain that covers those losses is an accounting entry, not a payment. It records the change in fair value of Cipher's warrant liability over the quarter, and no cash arrived with it. The same warrants flip the per-share picture once their shares enter the count: basic earnings were 8 cents a share, while the diluted figure is a loss of 22 cents. Interest expense, meanwhile, is real and rising, at $59.0 million for the quarter against $1.3 million a year earlier, on long-term borrowings of $5.45 billion.
The contracted future is the counterweight. An amended lease at Barber Lake adds a second 10-year term with a tenant the filing calls a leading AI lab, taking contracted revenue at the site to about $9.1 billion, with about $5.2 billion of that rent new. Data halls at Black Pearl and Barber Lake are scheduled to come online in phases through year-end, and a third site, Stingray, is due to finish its shell in the fourth quarter.
For businesses
Amazon Business is Amazon’s purchasing store for companies, with business accounts and quantity ordering.Register with Amazon BusinessCipher paid for the pivot during the quarter. It sold $850 million of zero-coupon convertible notes due 2032, converted about $165.9 million of its 2030 notes into stock to retire more than 90% of that issue, and grew its development pipeline to about 5.9 gigawatts. ERCOT's Batch Zero process gave the 1-gigawatt Colchis site a conditional base load classification, and the company bought Horizon, a 70-megawatt Texas site it expects to energize in 2029.
The nine-month ledger shows what the buildout costs before the rent scales. Cipher lost $350.2 million across the first three quarters of 2026, and property and equipment on its balance sheet reached $3.90 billion, up from $633.4 million at the end of 2025. It closed September with $656.0 million of cash and $1.72 billion of restricted cash, most of it committed to construction already under way.
The conversation.
Loading comments…
A little more perspective.
Reading is free. Verified members can comment and reply for $2 a month.