$2 / month

Comment and reply across TML.

Start or manage membership

Most pulsed

Latest from other desks

tml.the modern leap
News / U.S.

FAA Pauses Juniper Router Deployment Pending Testing

The Federal Aviation Administration said on Tuesday, November 17, 2026, that it was immediately pausing deployment of additional Juniper routers pending further testing, days after a nationwide ground stop tied to the router program canceled more than 18,000 flights. Thirteen Democratic senators led by Maria Cantwell had urged the pause in a letter dated November 16. The agency still hasn't established a definitive root cause for the November 13 outage.

TML News DeskNov 17, 3:07 PM ET · 2 min read

Edited and fact-checked by Stephen Sprague

A civilian air traffic controller briefs a visitor inside the Kingsley Field tower in Klamath Falls, Oregon (archive). The November 13 outage hit communications and radar feeds at 17 of the nation's 22 en route air traffic control centers. Photo: Air National Guard, Tech. Sgt. Jefferson Thompson, via DVIDS.
Summary

The pause freezes a 3,648-router conversion with 69 devices live. Flights are running, but the modernization program that caused the longest ground stop since 2001 can't move again until the FAA shows the routers pass operational testing, independent validation and a verified failover.

Tap a passage. React to the part that matters.

At an L3Harris lab in Florida, two routers sat under test on Tuesday while the FAA stopped the program that installed them.

The Federal Aviation Administration said on Tuesday, November 17, that it was immediately pausing deployment of additional Juniper routers pending further testing. The decision follows the nationwide ground stop of Friday, November 13, which lasted nearly five hours and led to the cancellation of more than 18,000 flights. Transportation Secretary Sean Duffy called it the longest halt to U.S. departures since the September 11, 2001 attacks.

Thirteen Democratic senators on the Senate Commerce Committee, led by Maria Cantwell of Washington, pressed for the halt in a letter dated November 16 and released on Tuesday. Citing figures from contractor L3Harris, the senators wrote that the copper-to-fiber conversion involves 3,648 Juniper routers, that about 400 devices have been installed, and that 69 are operational. Thousands of conversions remain, and the senators said the FAA must address the safety and reliability questions before any expansion.

Duffy said on Monday that investigators still don't know why a Juniper router installed by L3Harris at a remote radio communications site in El Dorado, Arkansas, overloaded a key government communications system. The site generated about 1,000 connection attempts every four to five seconds. The FAA's initial investigation pointed to two possible sources of the data overload, the El Dorado site and a radar site in Amarillo, Texas, where L3Harris had replaced a router about three weeks earlier.

Engineers are testing both routers at the L3Harris lab in Florida, and the FBI is working with the Transportation Department, the FAA and L3Harris on the investigation without taking possession of equipment. The FAA has disabled the broadcasting function on the new routers, and on about 60 other routers in the system, as a precaution. Hewlett Packard Enterprise, which owns Juniper Networks, has said its equipment was working as configured. The FAA hasn't established whether the failure came from defective equipment or from an installation or configuration error.

Senators set the conditions for any restart in their letter. Deployment should resume only after the FAA demonstrates readiness through improved operational testing, independent validation, verified failover capability and rollback procedures. The letter also asks for a joint technical briefing with the FAA, L3Harris and Juniper, and for information by November 23. Duffy was set to brief senators on Tuesday.

Travelers aren't facing a new stop while the program sits frozen. Flights are operating, the 69 live routers are running with the broadcasting function off, and the network's copper-era equipment still carries the system the fiber conversion was meant to replace. What the pause changes is the schedule, not the sky. The next dated step is the senators' November 23 deadline for answers on root cause and on why the safeguards didn't contain the failure.

Sources

The conversation

A little more perspective.

Reading is free. Verified members can comment and reply for $2 a month.

The conversation.

Loading comments…

Keep your curiosity going.

Some links here are affiliate links. If you buy through one, we might make a commission — it never changes what you pay. As an Amazon Associate I earn from qualifying purchases.