Lee County Board Delays Royal Palm Renovation Vote Friday
The Lee County School Board cut a Royal Palm renovation authorization from 5.8 million dollars to 5.3 million on November 17, 2026 and postponed the final vote to a special meeting on November 20, after parents of medically fragile Buckingham students demanded to see the building plans first.
Edited and fact-checked by Stephen Sprague
The Lee County board votes on the 5.3 million dollar Royal Palm renovation on November 20, and the plans families demanded are now public, so the vote tests the design itself instead of the district's process.
Parents packed the Lee County Public Education Center on November 17 and told board members not to fund a renovation they hadn't seen. Dozens of attendees filled the boardroom and the overflow rooms during a four-hour meeting, and nearly 45 people signed up for public comment under a board policy that limited each speaker to one minute.
Board Member Vanessa Chaviano pulled the renovation item for discussion and asked why the price had risen from the 5.3 million dollars the board approved in its September budget, after the agenda asked members to authorize up to 5.8 million dollars in capital millage funds and let the superintendent sign the contracts. Chief Operations Officer Donald Neese said the added amount included 475,000 dollars in earlier architectural study purchase orders, and Chaviano proposed capping the spending at 5.3 million dollars before the board approved the cap unanimously and postponed the final vote.
Board Member Jada Langford-Fleming put the transparency problem in one sentence when she said, "My biggest concern here is that the public hasn't gotten to see what we know. I have a hard time supporting something that we haven't been transparent with the public." Board Member Debbie Jordan noted that the board never formally voted on the consolidation itself, and she told the district, "Show them what it looks like. Show the plan." The district had withheld the renderings from the public under a building security exemption in Florida's public records law, and it released the drawings on the night of November 18, after a parent meeting where families saw them first.
Buckingham Exceptional Student Center serves about 77 students with severe medical, physical and cognitive disabilities, including children who are non-verbal, blind or unable to regulate their body temperature, and its campus is fully indoors. Royal Palm serves 117 students on an outdoor campus built around open courtyards, and Katie Peterson, the Buckingham parent liaison and the mother of Grace, a second-grader who's blind and has severe heat intolerance, asked the board to table the vote until the plans were public. Christie Steinkamp, whose daughter Aubrey attends Buckingham, told the board, "My child's safety is not negotiable," and families want enclosed, climate-controlled hallways, covered temperature-controlled wheelchair parking, and protection from construction noise and dust in writing.
Royal Palm holds 117 students against a state-rated capacity of 230, and Buckingham holds 77 against a capacity of 125, so merging 194 students onto one campus lifts utilization to 84.3 percent, and that arithmetic is why administrators want the merger. The unified model standardizes staffing at one aide for every six students across 22 classrooms and one lead teacher for every nine students, and it cuts total staff from 93 to 55 while eliminating 26.5 full-time aide positions, which is the line staff are fighting. The district projects savings of 2.57 million dollars a year from a 3.83 million dollar operating budget, with 100,000 dollars set aside once for sensory rooms and fencing, 95,000 dollars a year for a full-time behavior specialist, and 85,000 dollars a year to upgrade the social worker into a licensed mental health counselor. Superintendent Denise Carlin warned that waiting until the regular meeting on December 8 would make the August 2027 opening impossible, so the board set the special meeting for 2 to 5 p.m. on Friday, November 20, and that vote decides whether the plan gets its money or goes back to the district for a public design.
The conversation.
Loading comments…
A little more perspective.
Reading is free. Verified members can comment and reply for $2 a month.