Barcelona Airport Runs One Runway Through November 26
Barcelona-El Prat is operating on a single runway, 06R/24L, from November 16 to 26 while Aena builds a rapid exit taxiway, and the airport has removed 1,441 slots, about 15 percent of capacity, from schedules it adjusted in advance.
Edited and fact-checked by Stephen Sprague
El Prat's two closed runways reopen on November 26, and Aena's night works at the field continue into the first half of December.
One strip of pavement is carrying every arrival and departure at Spain's second-busiest airport this week. Barcelona-El Prat closed runways 02/20 and 06L/24R on November 16 and will keep them closed until November 26, which leaves runway 06R/24L to carry the full schedule while crews build a new rapid exit taxiway.
Airport operator Aena removed 1,441 slots from the period, roughly 15 percent of the airport's capacity, and it coordinated the cut with airlines and slot coordinators in advance. The reduction is already built into published schedules, so a removed slot is not a cancelled flight. The aeronautical notice runs from 23:00 UTC on November 15 to 22:59 UTC on November 26, and the airport stays open throughout.
Crews are building a €3.1 million rapid exit that links runway 02/20 to taxiway T4. The exit sits inside a wider airfield project of about 12.5 months that includes new pavement, drainage, signage, and electrical systems. Aena announced the project on September 18 and work began on September 21, and night works with occasional further closures continue into the first half of December.
The single runway also changes the airspace over the towns southwest of the field. Departure and arrival paths that normally spread across three runways now concentrate on the one open runway and the towns under its flight paths. Aena says the finished exit will cut holding, maneuvering, and taxi times, and it will not raise the airport's declared capacity.
Travelers get no list of affected flights from the operator. Aena does not name the airlines or routes touched by the slot cut, so the practical position is simple: the schedule a passenger holds already reflects the single-runway operation, and any change will come from the airline. The two closed runways reopen on November 26, with the night works still to come behind them.
The conversation.
Loading comments…
A little more perspective.
Reading is free. Verified members can comment and reply for $2 a month.